Skip to the content

O&M

KPIs and Monitoring

Key assumptions made in earlier stages of the safety lifecycle are validated through comparison against data collected from production systems. Key performance indicators are graphically displayed to show how the system is meeting the design requirements. Multiple facilities in varying regions can be monitored through a single interface.

Maintenance Support

Using the Override Risk Analysis report operations can understand the risk associated with a particular bypass operation. Additionally operations can review other mitigation in place and determine what other IPLs are impacted by a particular override. This information is invaluable and helps ensure safer and more productive override operations.